Gather roof records
Collect prior permits, drawings, invoices, repairs, leak history and known material layers. Mark age or composition as unknown where evidence is absent.
Existing-roof decision
Organize existing layers, deck and moisture evidence, structural questions, ventilation, edge interfaces and approval dependencies.
Decision file
Collect prior permits, drawings, invoices, repairs, leak history and known material layers. Mark age or composition as unknown where evidence is absent.
Ask how layers, fastening, moisture and deck condition will be assessed without assuming a new system can be installed over them.
Compare investigation access, replacement unit rates, concealed-condition documentation and who approves additional deck work.
Weight, attachment, substrate and design adequacy require appropriate review; a visual summary cannot establish suitability.
Record how the proposed build-up changes ventilation paths, edges, flashings, wall interfaces, gutters and rooftop equipment.
Require each proposal to explain why retrofit or tear-off is recommended, which evidence is pending and what findings would change the path.
Divide the roof into areas and record known layers, leak history, repairs, deck information, moisture observations and access limitations. Assign each unknown to a proposed investigation step so a retrofit recommendation does not quietly depend on an unverified existing surface.
Map how each build-up changes eave thickness, gutters, wall flashings, skylights, curbs, vents, ridges and transitions to adjoining roofs. Ask for drawn details and responsibility for correcting existing conditions that cannot accept the proposed interface.
State which deck, moisture, structural, fastening or ventilation findings would confirm the chosen path, require redesign or trigger tear-off. Record who evaluates the evidence, when the decision occurs and how schedule and price changes are authorized.
Summarize evidence by roof area: known layers, attachment, deck, moisture, repairs, ventilation and interfaces. State which investigations were completed, which areas remained inaccessible and which professional inputs informed the selected build-up. Map findings that trigger deck replacement, additional tear-off, drying, redesign or work stoppage, with written approval and pricing rules. Attach the accepted assembly section and interface details. The memorandum documents a decision from available evidence; it does not certify hidden conditions or allow the project to ignore different findings discovered when the roof is opened.